File:SAS 7617 (6172977531).jpg

From Wikimedia Commons, the free media repository
Jump to navigation Jump to search

Original file (2,400 × 1,594 pixels, file size: 3.35 MB, MIME type: image/jpeg)

Captions

Captions

Add a one-line explanation of what this file represents

Summary

[edit]
Description Workers completed tunneling for the first phase of the Second Avenue Subway on Sept. 22, 2011, when the project's tunnel boring machine reached the Lexington Av-63 St station, breaking into the existing subway system. The 485-ton, 450-foot-long TBM used a 22-foot diameter cutterhead to mine 7,789 linear feet in two tunnels, averaging approximately 60 linear feet a day. Photo by Metropolitan Transportation Authority / Patrick Cashin.
Date
Source

SAS_7617

  • Uploaded by tm
Author Metropolitan Transportation Authority of the State of New York

Licensing

[edit]
w:en:Creative Commons
attribution
This file is licensed under the Creative Commons Attribution 2.0 Generic license.
You are free:
  • to share – to copy, distribute and transmit the work
  • to remix – to adapt the work
Under the following conditions:
  • attribution – You must give appropriate credit, provide a link to the license, and indicate if changes were made. You may do so in any reasonable manner, but not in any way that suggests the licensor endorses you or your use.
This image, originally posted to Flickr, was reviewed on 29 December 2013 by the administrator or reviewer File Upload Bot (Magnus Manske), who confirmed that it was available on Flickr under the stated license on that date.

File history

Click on a date/time to view the file as it appeared at that time.

Date/TimeThumbnailDimensionsUserComment
current04:57, 29 December 2013Thumbnail for version as of 04:57, 29 December 20132,400 × 1,594 (3.35 MB)File Upload Bot (Magnus Manske) (talk | contribs)Transferred from Flickr by User:tm

There are no pages that use this file.

Metadata