File:KSC-05-S-00096 (ksc 041505 sssr).webm
KSC-05-S-00096_(ksc_041505_sssr).webm (WebM audio/video file, VP9/Opus, length 3 min 21 s, 320 × 212 pixels, 309 kbps overall, file size: 7.39 MB)
Captions
Summary
[edit]DescriptionKSC-05-S-00096 (ksc 041505 sssr).webm |
English: You're watching NASA Direct. Now on the NASA Space Shuttle Status Report: Passing the test_ Space Shuttle Discovery gets an excellent grade on its tanking test in preparation for launch. Then, closing up_ Raffello's hatch closes, ready for its trip to the ISS. And work progresses on orbiter Atlantis. NASA's Space Shuttle Status Report starts right now_ Intro Music. I'm Jessica Rye at NASA's Kennedy Space Center and this is the NASA Space Shuttle Status Report. We're just four weeks away from the opening of the launch window for STS-114, NASA's Return to Flight mission to the International Space Station. Now at the launch pad, final checkout on Space Shuttle Discovery is picking up_ On Thursday, April 14, 2005, a successful 'tanking test' was performed under simulated launch conditions on Discovery's External Tank. The Rotating Service Structure rolled back prior to the tanking test and at 8:14 a.m., the fueling began with the flowing of liquid hydrogen and liquid oxygen into the tank. Later, the ice debris team carefully inspected the tank for frost and ice buildup. Some ice is expected when propellants are loaded into the tank. The team reported both the tank and the vehicle were in excellent condition. The tank was emptied and the test was complete at 4 p.m. when the team reached the T-31 second mark in the simulated countdown. Meanwhile, Discovery's cargo container closed its hatch. Inside the container, named 'Raffaello,' are racks that will carry supplies to and from the International Space Station. This pressurized cargo container is scheduled to be installed inside Discovery's payload bay at the end of the month. Orbiter Atlantis continues making progress in Orbiter Processing Facility bay 1. New this week, installation of heat shields on each of Atlantis' main engines. The heat shields are two semi-circled-shaped sections of Thermal Protection System tile that fit around the engine interfaces. And with boom installation complete, Atlantis is now undergoing radio frequency closed loop functional testing and systems testing for flight. Space Shuttle Atlantis has a launch window that begins July 12 and ends July 31. That's all the time we have for this week's Space Shuttle Status Report. Be sure to mark your calendars for May 15 to June 3 2005, NASA's official window for Space Shuttle Discovery's Return to Flight mission, designated STS-114 to the International Space Station_ Until next time, log on to nasa.gov for the latest in Return to Flight and NASA mission news. I'm Jessica Rye for the NASA Space Shuttle Status Report. End Music. You're watching NASA Direct. Now on the NASA Space Shuttle Status Report: Passing the test_ Space Shuttle Discovery gets an excellent grade on its tanking test in preparation for launch. Then, closing up_ Raffello's hatch closes, ready for its trip to the ISS. And work progresses on orbiter Atlantis. NASA's Space Shuttle Status Report starts right now_ Intro Music. I'm Jessica Rye at NASA's Kennedy Space Center and this is the NASA Space Shuttle Status Report. We're just four weeks away from the opening of the launch window for STS-114, NASA's Return to Flight mission to the International Space Station. Now at the launch pad, final checkout on Space Shuttle Discovery is picking up_ On Thursday, April 14, 2005, a successful 'tanking test' was performed under simulated launch conditions on Discovery's External Tank. The Rotating Service Structure rolled back prior to the tanking test and at 8:14 a.m., the fueling began with the flowing of liquid hydrogen and liquid oxygen into the tank. Later, the ice debris team carefully inspected the tank for frost and ice buildup. Some ice is expected when propellants are loaded into the tank. The team reported both the tank and the vehicle were in excellent condition. The tank was emptied and the test was complete at 4 p.m. when the team reached the T-31 second mark in the simulated countdown. Meanwhile, Discovery's cargo container closed its hatch. Inside the container, named 'Raffaello,' are racks that will carry supplies to and from the International Space Station. This pressurized cargo container is scheduled to be installed inside Discovery's payload bay at the end of the month. Orbiter Atlantis continues making progress in Orbiter Processing Facility bay 1. New this week, installation of heat shields on each of Atlantis' main engines. The heat shields are two semi-circled-shaped sections of Thermal Protection System tile that fit around the engine interfaces. And with boom installation complete, Atlantis is now undergoing radio frequency closed loop functional testing and systems testing for flight. Space Shuttle Atlantis has a launch window that begins July 12 and ends July 31. That's all the time we have for this week's Space Shuttle Status Report. Be sure to mark your calendars for May 15 to June 3 2005, NASA's official window for Space Shuttle Discovery's Return to Flight mission, designated STS-114 to the International Space Station_ Until next time, log on to nasa.gov for the latest in Return to Flight and NASA mission news. I'm Jessica Rye for the NASA Space Shuttle Status Report. End Music. |
||
Date | Taken on 19 April 2005 | ||
Source |
|
||
Author | NASA Kennedy Space Center | ||
Keywords InfoField | Return_to_Flight; Endeavor; Discovery; Kennedy_Space_Center; STS-114; Space_Shuttle_Status_Report; Atlantis |
Licensing
[edit]Public domainPublic domainfalsefalse |
This file is in the public domain in the United States because it was solely created by NASA. NASA copyright policy states that "NASA material is not protected by copyright unless noted". (See Template:PD-USGov, NASA copyright policy page or JPL Image Use Policy.) | ||
Warnings:
|
File history
Click on a date/time to view the file as it appeared at that time.
Date/Time | Thumbnail | Dimensions | User | Comment | |
---|---|---|---|---|---|
current | 03:30, 10 May 2024 | 3 min 21 s, 320 × 212 (7.39 MB) | OptimusPrimeBot (talk | contribs) | Imported media from http://images-assets.nasa.gov/video/ksc_041505_sssr/ksc_041505_sssr~orig.mp4 |
You cannot overwrite this file.
File usage on Commons
The following page uses this file:
Transcode status
Update transcode statusMetadata
This file contains additional information such as Exif metadata which may have been added by the digital camera, scanner, or software program used to create or digitize it. If the file has been modified from its original state, some details such as the timestamp may not fully reflect those of the original file. The timestamp is only as accurate as the clock in the camera, and it may be completely wrong.
Short title | Space Shuttle Status Report 4-15-05 |
---|---|
Copyright holder | 2005 |
Software used |