File:Baustelle Wasserleitungen Brenner und Würzburger Straße in Tauberbischofsheim.jpg
Jump to navigation
Jump to search
Size of this preview: 800 × 600 pixels. Other resolutions: 320 × 240 pixels | 640 × 480 pixels | 1,024 × 768 pixels | 1,280 × 960 pixels | 2,560 × 1,920 pixels | 7,296 × 5,472 pixels.
Original file (7,296 × 5,472 pixels, file size: 6.1 MB, MIME type: image/jpeg)
Categories:
- Construction sites in Würzburger Straße (Tauberbischofsheim)
- 2020 in roadworks in Main-Tauber-Kreis
- June 2020 in roadworks in Germany
- June 2020 in construction in Tauberbischofsheim
- Closed roads in Main-Tauber-Kreis
- Road barriers in Tauberbischofsheim
- Blocked roads in Tauberbischofsheim
- Roadworks in Tauberbischofsheim
- Plastic fences in Tauberbischofsheim
- Water supply infrastructure in Tauberbischofsheim