Category talk:Construction of Marilao station (Saog section), 12-2021
The Saog construction section is (beside or interconnects with Ibayo section, which surrounds SM Marilao) further divided into 2 Categories, namely a) Construction of Marilao station (MacArthur Highway, Saog), 12-2021 - that is, Barangay Saog along MacArthur Highway and b) Construction of Marilao station (Saog Centro), 12-2021 that is, from the Barangay Hall to terminus, Marilao Riverside - in Barangay Saog, Marilao. (Marilao station elevated railway structures viaduct 3 Level station at Km. 13+676, 190 meters platform Bulacan - PNR Clark Phase 1 (Malolos-Tutuban) Contract package 01 elevated structures, depot and 6 stations NSCR North (Tutuban–Malolos–Clark) "NSCR North, or PNR Clark, was divided into 2 phases. NSCR North 1 involves 21.2 Kms. Tutuban-Malolos segment 37.9 kms. North–South Commuter Railway Partial reactivation of North Caloocan Line - construction of embankment, bored pile foundation, span-by-span viaduct and PC box girder bridge; the elevated dual-track system is standard-gauge; viaduct of the piers - connected by the Span by Span with spans foundation works completed and Balanced Cantilever Construction Method using precast concrete box girders of 60 to70 tons each cast in Calumpit Yard; works upward for structural works with remaining launching gantries with a 50-meter span having started. Enmankment - reinforced -soil railway structure with rigid facing RRR, bored pile foundation, viaduct span-by-span, PC Box Girder Bridge).FBenjr123 (talk) 07:51, 26 December 2021 (UTC).