Category:Mobile Launcher Platform-2
Jump to navigation
Jump to search
former platform used to carry and launch rockets at Kennedy Space Center Launch Complex 39 | |||||
Upload media | |||||
Instance of | |||||
---|---|---|---|---|---|
Country of origin | |||||
Manufacturer |
| ||||
Inception |
| ||||
Dissolved, abolished or demolished date |
| ||||
Significant event |
| ||||
Mass |
| ||||
Width |
| ||||
Length |
| ||||
Height |
| ||||
| |||||
English: Mobile Launcher Platform 2 or MLP-2, formerly Mobile Launcher 2 or ML-2 during the Apollo program, was one of three Mobile Launcher Platforms used at Kennedy Space Center Launch Complex 39. MLP-2 was used between the late 1960s and early 1970s as part of the Apollo program, and was operational as part of the Space Shuttle program. MLP-2 was demolished in 2021.
Subcategories
This category has the following 2 subcategories, out of 2 total.
Media in category "Mobile Launcher Platform-2"
The following 88 files are in this category, out of 88 total.
-
Apollo 12 Saturn V on pad 39-A.jpg 1,340 × 1,696; 432 KB
-
Apollo 12 Saturn V on Transporter - GPN-2000-001854.jpg 2,337 × 3,000; 6.54 MB
-
Apollo 12 Saturn V rollout past the Mobile Service Structure (MSS).jpg 1,641 × 1,287; 586 KB
-
Apollo 12 Saturn V vents liquid oxygen during a Countdown Demonstration Test.jpg 1,700 × 2,134; 609 KB
-
Apollo 12 space vehicle leaving the Vehicle Assembly Building (VAB).jpg 6,510 × 8,240; 7.56 MB
-
Apollo 12 space vehicle on the way from the Vehicle Assembly Building (VAB) to Pad A.jpg 3,251 × 4,080; 2.23 MB
-
Apollo 14 Launch - GPN-2000-000633.jpg 1,965 × 3,000; 8.4 MB
-
Apollo 14 rollout from VAB.jpg 3,714 × 4,710; 2.73 MB
-
Apollo 14 rollout to Pad A (1).jpg 3,622 × 4,637; 2.42 MB
-
Apollo 14 rollout to Pad A (2).jpg 3,289 × 4,040; 2.5 MB
-
Apollo 14 Saturn V on pad 39-A fueled.jpg 718 × 900; 120 KB
-
Apollo 6 and Mobile Service Structure during rollout.jpg 1,400 × 1,114; 310 KB
-
Apollo 6 on the pad at sunset.jpg 1,976 × 2,679; 449 KB
-
Apollo 6 on the pad.jpg 726 × 900; 166 KB
-
Apollo 6 rolls out of the Vehicle Assembly Building.jpg 1,860 × 2,347; 535 KB
-
Apollo 6 Saturn V during rollout (48264641291).jpg 3,249 × 4,120; 5.19 MB
-
Apollo 9 at pad 39A on the night before launch.jpg 2,256 × 2,826; 1.11 MB
-
Apollo 9 prime crew members.jpg 4,143 × 3,300; 1.97 MB
-
Apollo 9 Saturn V.jpg 4,655 × 3,700; 2.47 MB
-
Atlantis at the pad 2.jpg 2,000 × 3,008; 742 KB
-
Atlantis at the pad.jpg 3,000 × 1,965; 762 KB
-
Atlantis on Crawler Transporter on its way to pad 39A.jpg 2,008 × 3,000; 435 KB
-
Atlantis on Crawler Transporter with Pad 39A in background.jpg 3,000 × 2,008; 349 KB
-
Atlantis on Crawler Transporter.jpg 2,008 × 3,000; 460 KB
-
Atlantis on its way.jpg 3,000 × 2,008; 439 KB
-
Atlantis Rollback (STS-117).jpg 1,693 × 1,131; 331 KB
-
Crawler transporter with Atlantis on the ramp to pad 39A.jpg 3,000 × 2,008; 321 KB
-
Crawler-transporter carrying Solid Rocket Boosters for STS-134 (KSC-2010-5336).jpg 3,000 × 2,000; 711 KB
-
Discovery and water truck move toward LC-39A ahead of STS-120 (KSC-07PD-2624).jpg 3,000 × 2,008; 761 KB
-
Discovery Launch Pad 39A.jpg 3,000 × 2,023; 4.05 MB
-
Discovery stack at VAB.jpg 3,000 × 2,008; 634 KB
-
Go Atlantis!.jpg 3,008 × 2,000; 485 KB
-
Ground-Level View of Pad A, Launch Complex 39, Kennedy Space Center.jpg 5,591 × 7,500; 5.67 MB
-
Kennedy Space Center (36017553382).jpg 4,896 × 2,754; 5.53 MB
-
Launch of Skylab.ogv 14 s, 384 × 288; 722 KB
-
Launch of unmanned Skylab 1 space station (S73-26913).jpg 3,905 × 3,932; 2.06 MB
-
Launch Platforms with Launcher Umbilical Towers under construction (KSC-64C-5536).jpg 3,000 × 2,352; 803 KB
-
Launch Platforms with Launcher Umbilical Towers under construction (KSC-65C-0263).jpg 2,294 × 1,800; 1.13 MB
-
LUT -1 being moved to VAB - January, 1966 (48260918472).jpg 4,650 × 3,481; 11.65 MB
-
Nighttime, ground level view of Launch Complex 39 and Apollo 12 spacecraft.jpg 2,355 × 2,874; 477 KB
-
Prior to launch in May 1973, the Skylab space station.jpg 1,582 × 1,338; 273 KB
-
Roulle sous les lumières.jpg 3,008 × 2,000; 366 KB
-
Saturn Apollo Program (6890492).jpg 2,967 × 3,000; 10.41 MB
-
Saturn V Apollo 12 on Mobile Launcher 2 (cropped).jpg 2,626 × 1,970; 1.86 MB
-
Saturn V Apollo 12.jpg 3,682 × 4,707; 3.34 MB
-
Skylab - Start.jpg 419 × 494; 39 KB
-
Skylab 2 Crew Members Saturn V Skylab I pose.jpg 830 × 1,048; 340 KB
-
Skylab 2 Crew Members.jpg 4,726 × 6,876; 3.84 MB
-
SKYLAB I - view from a distance.jpg 4,699 × 2,118; 1.58 MB
-
Skylab launch on Saturn V.jpg 2,256 × 2,814; 855 KB
-
Skylab launch.jpg 5,678 × 3,921; 9.34 MB
-
Skylab-73-H-258.jpg 900 × 721; 105 KB
-
Skylab-73-HC-440HR.jpg 2,205 × 3,240; 654 KB
-
Sound suppression test of mobile launcher platform at KSC (KSC-04PD-1064).jpg 3,008 × 2,000; 825 KB
-
Sound suppression water system test at KSC Launch Pad 39A.jpg 3,008 × 2,000; 877 KB
-
Space Shuttle Columbia rolls out to Launch Pad 39B.jpg 2,304 × 1,536; 617 KB
-
STS-076 shuttle.jpg 1,538 × 2,241; 159 KB
-
STS-109 Columbia rollout KSC-02PD-0043.jpg 3,000 × 2,293; 788 KB
-
STS-117 rollback1.jpg 3,000 × 2,008; 417 KB
-
STS-117 rollback2.jpg 3,000 × 2,008; 676 KB
-
STS-117 rollback3.jpg 3,000 × 2,008; 484 KB
-
STS-117 rollback5.jpg 2,008 × 3,000; 546 KB
-
STS-117 second rollout.jpg 3,008 × 2,000; 457 KB
-
STS-120 launchpad arrival.jpg 3,000 × 2,008; 4.01 MB
-
STS-123rollout1.jpg 3,000 × 2,008; 546 KB
-
STS-125 RSS Retract LA1.jpg 3,000 × 2,000; 3.72 MB
-
STS-134 Endeavour Rollout 1.jpg 2,008 × 3,000; 4.27 MB
-
STS-134 Endeavour Rollout 3.jpg 3,000 × 2,000; 3.52 MB
-
STS-134 Endeavour Rollout 6.jpg 3,000 × 2,000; 4.19 MB
-
STS-134 Mobile Launcher Platform with two Solid Rocket Boosters.jpg 3,000 × 2,000; 2.41 MB
-
STS-28 Rollout - GPN-2000-000669.jpg 3,215 × 4,044; 1.6 MB
-
STS-57 Launch Preparations - GPN-2000-000750.jpg 3,000 × 2,017; 6.06 MB
-
STS-98 Atlantis on the crawler.jpg 2,670 × 2,003; 528 KB
-
STS-98 Atlantis rolls to the VAB (KSC-01PP-0135).jpg 1,752 × 2,670; 979 KB
-
STS-98 Atlantis rolls to the VAB (KSC-01PP-0141).jpg 1,742 × 2,670; 1.07 MB
-
STS-98 Space Shuttle Atlantis rolls back to Launch Pad 39A (KSC-01PP-0184).jpg 1,781 × 2,670; 985 KB
-
STS1172ndrollout.jpg 3,008 × 2,000; 515 KB
-
STS132 rollout Apr9.jpg 3,000 × 2,000; 700 KB
-
The assembly building takes shape, January 1965.jpg 561 × 441; 28 KB
-
The Shuttle Flame Trenches From Above (6940147668).jpg 4,958 × 3,633; 5.34 MB
-
The Skylab 1-Saturn V space vehicle is lifts off from Launch Pad 39A on May 14, 1973.jpg 5,678 × 3,929; 3.76 MB
-
Two Space Shuttle Solid Rocket Booster on the Crawler transporter.jpg 2,000 × 3,000; 3.1 MB
-
Two Space Shuttle SRBs on the Crawler transporter.jpg 2,000 × 3,000; 3.85 MB
-
VABConstruction.jpg 3,000 × 2,288; 6.18 MB