Category:East Side Access construction/2019/08/30
Jump to navigation
Jump to search
Media in category "East Side Access construction/2019/08/30"
The following 26 files are in this category, out of 26 total.
-
Ceiling frame installation in the future LIRR Terminal. 08-23-2019 (48647823597).jpg 4,608 × 2,592; 4.17 MB
-
Installing a retaining wall in the future Mid-Day Storage Yard. 08-26-2019 (48647690966).jpg 1,512 × 2,016; 1.21 MB
-
Installing cables along the tunnels in Queens. 08-27-2019 (48647324588).jpg 3,024 × 4,032; 3.28 MB
-
Performing pressure tests on tunnel systems. 08-27-2019 (48647690906).jpg 4,032 × 3,024; 3.58 MB