Category:East Side Access construction/2019/03/29
Jump to navigation
Jump to search
Media in category "East Side Access construction/2019/03/29"
The following 35 files are in this category, out of 35 total.
-
Installation of conduits in the west cavern. (CM007, 03-27-2019) (47492983941).jpg 4,608 × 3,456; 4.3 MB
-
Mobilizing a work site under the 39th Street bridge. (CH058A, 03-25-2019) (46577658275).jpg 1,309 × 1,706; 1.37 MB
-
Setting a light pole for the Mid-day storage yard. (CQ033, 03-25-2019) (46577661385).jpg 3,024 × 4,032; 1.82 MB
-
Setting track in the upper level of the east cavern. (CM007, 03-27-2019) (46577659205).jpg 1,536 × 2,048; 1.01 MB
-
Welding the newly installed westbound bypass track. (CH057D, 03-27-2019) (47440134212).jpg 1,512 × 2,016; 1.08 MB