Category:Crookwell Wind Farm
Jump to navigation
Jump to search
English: Crookwell Wind Farm, located at Crookwell west of Goulburn, New South Wales, consists of eight 600 kW wind turbines giving a total capacity of 4.8 MW. It was the first grid-connected wind farm in Australia when built by Pacific Power in 1998. It is now owned by Eraring Energy, and the wind farm currently supplies electricity to Country Energy's "GreenPower" customers. (→Crookwell Wind Farm)
Upload media | |||||
Instance of | |||||
---|---|---|---|---|---|
Location | New South Wales, AUS | ||||
Nominal power output |
| ||||
| |||||
Media in category "Crookwell Wind Farm"
The following 2 files are in this category, out of 2 total.
-
Crookwell wind farm from the air.jpg 2,000 × 1,333; 2.27 MB
-
Crookwell Wind Farm.JPG 6,016 × 4,000; 7.59 MB