Category:Bombardier MOVIA C951/C951A
Jump to navigation
Jump to search
class of electric multiple units in Singapore | |||||
Upload media | |||||
Instance of |
| ||||
---|---|---|---|---|---|
Subclass of | |||||
Operator | |||||
Manufacturer |
| ||||
Location of creation | |||||
Train depot | |||||
| |||||
Media in category "Bombardier MOVIA C951/C951A"
The following 37 files are in this category, out of 37 total.
-
2016-04-03 Interior of MRT Train 02.jpg 5,184 × 3,456; 8.95 MB
-
Active Route Map Information System of Downtown Line in Singapore.jpg 4,288 × 2,848; 2.24 MB
-
Bombardier Movia C951 DRMD 20230819 222307.jpg 4,032 × 3,024; 2.84 MB
-
Bombardier Movia C951 DRMD 20230825 131503.jpg 4,032 × 3,024; 2.8 MB
-
Bombardier MOVIA C951 interior.jpg 960 × 720; 87 KB
-
Bombardier MOVIA C951 Interior.jpg 3,072 × 2,048; 2.9 MB
-
Bombardier Movia C951 mockup 020821.jpg 3,409 × 1,918; 3.25 MB
-
C951 mockup Exterior.jpg 3,264 × 2,448; 743 KB
-
C951 mockup Interior.jpg 1,920 × 1,080; 866 KB
-
C951 mockup Perch Seats.jpg 2,448 × 3,264; 449 KB
-
C951 train in the tunnel 151017.jpg 2,389 × 1,344; 2.42 MB
-
DT14 Bugis Bombardier C951 departing 20200902 141547.webm 1 min 4 s, 1,920 × 1,080; 32.44 MB
-
DT15 Promenade Bombardier C951 departing 20200902 142147.webm 18 s, 1,280 × 720; 9.37 MB
-
DT16 Bayfront MRT Platform A 20201201 151306.jpg 4,000 × 2,250; 3.9 MB
-
DT16 Bayfront MRT Platform C 20201201 151742.jpg 4,000 × 2,250; 3.19 MB
-
DT35 Expo MRT Platform C 20201107 221414.jpg 4,000 × 2,250; 3.07 MB
-
DT35 Expo MRT Platform C 20201107 221418.jpg 4,000 × 2,250; 3.17 MB
-
DT35 Expo MRT Platform C 20201107 221429.jpg 4,000 × 2,250; 2.92 MB
-
DT35 Expo MRT Platform C 20201107 221450.jpg 4,000 × 2,250; 3.07 MB
-
DT35 Expo MRT Platform D 20201107 221446.jpg 4,000 × 2,250; 2.84 MB
-
DTL Bombardier Movia C951 interior 20200919 171717.jpg 4,000 × 2,250; 2.84 MB
-
DTL train at Gali Batu Depot.jpg 1,440 × 1,763; 543 KB
-
DTL train interior.jpg 4,128 × 3,096; 3.4 MB
-
Dynamic Route Map Display in C951 train.jpg 5,248 × 3,936; 3.58 MB
-
Interior of the DTL Bombardier MOVIA.jpg 3,264 × 2,448; 2.49 MB
-
Interior view in C951 train.jpg 3,936 × 5,248; 6.99 MB
-
Label in C951 train.jpg 5,248 × 3,936; 6.73 MB
-
LED screen in C951 train.jpg 5,248 × 3,936; 7.06 MB
-
SBS Transit Downtown Line compartment 11-11-2023.jpg 4,032 × 3,024; 4.34 MB
-
SBS Transit Downtown Line train door 10-11-2023(1).jpg 4,032 × 3,024; 3.15 MB
-
SBS Transit Downtown Line train door 10-11-2023(2).jpg 4,032 × 3,024; 3.95 MB
-
SBS Transit Downtown Line train door 11-11-2023(1).jpg 3,024 × 4,032; 3.33 MB
-
SBS Transit Downtown Line train door 11-11-2023(2).jpg 3,024 × 4,032; 3.42 MB
-
SBST C951 Upgraded DRMD.jpg 4,000 × 3,000; 3.11 MB
-
Singapore Downtown Line Dynamic Route Map Display (Doors Closed).jpg 4,032 × 2,268; 2.06 MB
-
Singapore Downtown Line Dynamic Route Map Display (Doors Open).jpg 4,032 × 2,268; 1.99 MB
-
Singapore Downtown Line Dynamic Route Map Display.jpg 4,032 × 2,268; 1.46 MB