Category:Beijing Subway QKZ5
Jump to navigation
Jump to search
rolling stock of Capital Airport Express, Beijing Subway | |||||
Upload media | |||||
Instance of | |||||
---|---|---|---|---|---|
Subclass of | |||||
Operator |
| ||||
Manufacturer |
| ||||
Location of creation | |||||
Width |
| ||||
Height |
| ||||
| |||||
Subcategories
This category has only the following subcategory.
Media in category "Beijing Subway QKZ5"
The following 49 files are in this category, out of 49 total.
-
AIRPORT EXPRESS TRAIN BEIJING CAPITAL AIRPORT CHINA OCT 2012 (8345749678).jpg 3,678 × 2,753; 5.93 MB
-
Airport Line train in Wangjing area.jpg 3,872 × 2,592; 5.14 MB
-
Beijing Airport Express.jpeg 3,888 × 2,592; 3.52 MB
-
Beijing Subway Airport Express 01.jpg 1,299 × 678; 329 KB
-
CAE Tianzhu Depot at sunset (20191126163251).jpg 3,827 × 2,551; 5.8 MB
-
L-103 departing ZBAA Terminal 3 (20151202160634).jpg 4,000 × 2,664; 4.43 MB
-
L-1031 entering ZBAA Terminal 3 (20151202160224).jpg 4,000 × 2,664; 3.95 MB
-
L-109 entering ZBAA Terminal 3 Station (20160426154603).jpg 3,264 × 2,278; 6.36 MB
-
L1-101 leaving Terminal 3 (20191105132131).jpg 5,184 × 3,456; 6.89 MB
-
L1-102 leaving Terminal 3 (20191105130002).jpg 5,184 × 3,456; 8.18 MB
-
L1-1024 leaving Terminal 3 (20191105130015).jpg 5,184 × 3,456; 8.78 MB
-
L1-103 leaving Terminal 3 (20210108144337).jpg 6,743 × 4,495; 9.5 MB
-
L1-103 leaving Terminal 3 (20211229144235).jpg 6,456 × 4,304; 9 MB
-
L1-104 at Siyuanqiaoxi (20211214162629).jpg 6,210 × 4,140; 8.17 MB
-
L1-104 leaving Terminal 3 (20211229143135).jpg 6,495 × 4,330; 10.14 MB
-
L1-104 leaving Terminal 3 (20211229153733).jpg 5,638 × 3,759; 7.54 MB
-
L1-105 at Siyuanqiaoxi (20211214163726).jpg 5,889 × 3,926; 8.75 MB
-
L1-105 leaving Terminal 3 (20210108145502).jpg 4,406 × 2,937; 4.75 MB
-
L1-106 approaching Weigou Bridge (20211130123323).jpg 5,829 × 3,886; 8.7 MB
-
L1-106 at Caochangdi (20211201163035).jpg 5,823 × 3,882; 9.38 MB
-
L1-106 at Siyuanqiaoxi (20211214160427).jpg 6,083 × 4,055; 6.94 MB
-
L1-106 leaving Terminal 3 (20211229142034).jpg 5,728 × 3,819; 7.61 MB
-
L1-106 leaving Terminal 3 (20211229152635).jpg 6,517 × 4,345; 10.27 MB
-
L1-1071 leaving ZBAA T3 (20180814112959).jpg 4,536 × 2,976; 8.87 MB
-
L1-1072 leaving ZBAA T3 (20180814113002).jpg 4,536 × 2,976; 8.5 MB
-
L1-1073 leaving ZBAA T3 (20180814113004).jpg 4,536 × 2,976; 8.77 MB
-
L1-1074 leaving ZBAA T3 (20180814113007).jpg 4,536 × 2,976; 8.88 MB
-
L1-108 at Siyuanqiaoxi (20211214161528).jpg 6,285 × 4,190; 9.11 MB
-
L1-108 leaving Terminal 3 (20210108143208).jpg 6,238 × 4,159; 8.84 MB
-
L1-108 leaving Terminal 3 (20211229151535).jpg 6,635 × 4,423; 10.4 MB
-
L1-109 leaving Terminal 3 (20211229145334).jpg 6,280 × 4,187; 9.71 MB
-
L1-109 leaving Terminal 3 (20220115155803).jpg 5,362 × 3,575; 6.12 MB
-
L1-110 at Siyuanqiaoxi (20211214155325).jpg 4,924 × 3,283; 4.64 MB
-
L1-110 leaving Terminal 3 (20211229150435).jpg 6,868 × 4,579; 11.54 MB
-
L1-111 at Tianzhu Depot (20210406093813).jpg 5,787 × 3,858; 10.81 MB
-
L1-111 at Tianzhu Depot (20210430155907).jpg 4,597 × 3,065; 7.55 MB
-
L1-111 leaving Terminal 3 (20211231132954).jpg 5,103 × 3,402; 6.07 MB
-
L1-111 leaving Terminal 3 (20211231132957).jpg 5,577 × 3,718; 6.63 MB
-
L1-111 leaving Terminal 3 (20211231133001).jpg 5,333 × 3,555; 7.26 MB
-
L1-111 leaving Terminal 3 (20211231133004).jpg 6,267 × 4,178; 9.49 MB
-
L1-111 leaving Terminal 3 (20211231133006).jpg 5,780 × 3,853; 8.23 MB
-
L1-112 at Tianzhu Depot (20211220152009).jpg 5,982 × 3,988; 9.32 MB
-
L1-112,113,115,109,114 at Tianzhu Depot (20211108132738).jpg 5,835 × 3,890; 8.8 MB
-
L1-1141 at Tianzhu Depot (20210910151145).jpg 2,486 × 1,657; 2.11 MB
-
Outbound QKZ5 at Nanzhuyuan (20211201162502).jpg 5,938 × 3,959; 8.04 MB
-
The train of Airport Line, Beijing Subway.JPG 2,272 × 1,704; 1.18 MB
-
Trains of Capital Airport Express at Tianzhu Depot (20210910151139).jpg 5,841 × 3,894; 12.05 MB
-
Trains of Capital Airport Express at Tianzhu Depot (20210910151141).jpg 5,000 × 3,333; 8.52 MB
-
北京机场线车辆.JPG 4,288 × 2,848; 3.24 MB