File:Wind Farm Substation September 2007 - geograph.org.uk - 559448.jpg

From Wikimedia Commons, the free media repository
Jump to navigation Jump to search

Wind_Farm_Substation_September_2007_-_geograph.org.uk_-_559448.jpg (640 × 480 pixels, file size: 101 KB, MIME type: image/jpeg)

Captions

Captions

Add a one-line explanation of what this file represents

Summary

[edit]
Description
English: Wind Farm Substation September 2007 The substation for Scout Moor Windfarm is now near completion.

When the 26 wind turbines have been erected on the nearby moors the electricity will be exported to the National Grid via this newly built dedicated substation. The windfarm will consist of 26 individual wind turbines,each one generating 2.5MW.

In total the whole wind farm will generate 65MW enough power to supply the aveage needs of 40,000 homes.
Date
Source From geograph.org.uk
Author Paul Anderson
Attribution
(required by the license)
InfoField
Paul Anderson / Wind Farm Substation September 2007 / 
Paul Anderson / Wind Farm Substation September 2007
Camera location53° 38′ 41″ N, 2° 16′ 12″ W  Heading=90° Kartographer map based on OpenStreetMap.View this and other nearby images on: OpenStreetMapinfo
Object location53° 38′ 41″ N, 2° 16′ 09″ W  Heading=90° Kartographer map based on OpenStreetMap.View this and other nearby images on: OpenStreetMapinfo

Licensing

[edit]
w:en:Creative Commons
attribution share alike
This file is licensed under the Creative Commons Attribution-Share Alike 2.0 Generic license.
Attribution: Paul Anderson
You are free:
  • to share – to copy, distribute and transmit the work
  • to remix – to adapt the work
Under the following conditions:
  • attribution – You must give appropriate credit, provide a link to the license, and indicate if changes were made. You may do so in any reasonable manner, but not in any way that suggests the licensor endorses you or your use.
  • share alike – If you remix, transform, or build upon the material, you must distribute your contributions under the same or compatible license as the original.

File history

Click on a date/time to view the file as it appeared at that time.

Date/TimeThumbnailDimensionsUserComment
current04:52, 6 February 2011Thumbnail for version as of 04:52, 6 February 2011640 × 480 (101 KB)GeographBot (talk | contribs)== {{int:filedesc}} == {{Information |description={{en|1=Wind Farm Substation September 2007 The substation for Scout Moor Windfarm is now near completion. When the 26 wind turbines have been erected on the nearby moors the electricity will be exported t

There are no pages that use this file.

Metadata