File:White Hall Syracuse University.jpg
Original file (4,032 × 3,024 pixels, file size: 2.57 MB, MIME type: image/jpeg)
Captions
Summary
[edit]DescriptionWhite Hall Syracuse University.jpg |
English: The original building was constructed in 1954 to house the Law School. At that time, the building was known as White Hall. In 1966, Grant Auditorium as added on the south end and in 1985 Barclay Library was constructed on the east side with an enclosed atrium connecting the buildings. White Hall was renovated at the time of the Barclay Library addition.
Groundbreaking: June 15, 1953 Occupied: September 20, 1954 Dedicated: December 11, 1954 Named for: Ernest I. White, lawyer and president of Post-Standard, who donated $424,000 to Building Fund Funding: 1947 Building Fund Contractor: W.J. Burns Company Cost: $922,000 Architect: Begun by Lorimer Rich and Associates, completed by King & King Materials: Reinforced concrete with brick facing and limestone trim Location: North of Carrier Dome, west of Heroy Geology Building, and south of Crouse College Renovations: 1983-1985, 1997, 2014 Notes: White Hall was the ninth building completed in Syracuse University's $15 million postwar construction program. The College of Law, since its inception having moved to five different locations around the city of Syracuse, at last had a home on campus. When completed, the building held a library, classrooms, faculty and administrative offices, lounges and practice court rooms. As White Hall is situated on a hill it has two levels: the west side has four stories and the east has three. The Arnold M. Grant Auditorium was added in 1966. It is attached to the southern end of White Hall. The 1983-1985 renovation of White Hall added the Barclay Law Library to the northeast side of the structure. Named for H. Douglas Barclay, SU Law Class of 1961, NY State Senator and SU trustee, the addition provided for new administrative and faculty offices, upgraded classrooms, a student lounge area and more computer space. Constructed of red brick with limestone trim, it was designed by Bohlin Powell Larkin Cywinski Architects, with Hueber-Breuer Construction as contractor. The $4.5 million construction and refurbishment effort culminated, on March 22, 1985, in a rededication ceremony for the improved White Hall. A 1997 expansion project included renovations to White Hall as part of the $12.5 million budget when MacNaughton Hall was added to the north. In 2014 the Law Library moved to the new Dineen Hall and the space was allocated to other University purposes. |
Date | |
Source | Own work |
Author | Kiran891 |
Camera location | 43° 02′ 15.69″ N, 76° 08′ 12.06″ W | View this and other nearby images on: OpenStreetMap | 43.037691; -76.136683 |
---|
Licensing
[edit]- You are free:
- to share – to copy, distribute and transmit the work
- to remix – to adapt the work
- Under the following conditions:
- attribution – You must give appropriate credit, provide a link to the license, and indicate if changes were made. You may do so in any reasonable manner, but not in any way that suggests the licensor endorses you or your use.
- share alike – If you remix, transform, or build upon the material, you must distribute your contributions under the same or compatible license as the original.
File history
Click on a date/time to view the file as it appeared at that time.
Date/Time | Thumbnail | Dimensions | User | Comment | |
---|---|---|---|---|---|
current | 11:21, 13 July 2023 | 4,032 × 3,024 (2.57 MB) | Kiran891 (talk | contribs) | Uploaded own work with UploadWizard |
You cannot overwrite this file.
File usage on Commons
There are no pages that use this file.
File usage on other wikis
The following other wikis use this file:
- Usage on www.wikidata.org
Metadata
This file contains additional information such as Exif metadata which may have been added by the digital camera, scanner, or software program used to create or digitize it. If the file has been modified from its original state, some details such as the timestamp may not fully reflect those of the original file. The timestamp is only as accurate as the clock in the camera, and it may be completely wrong.
Camera manufacturer | samsung |
---|---|
Camera model | SM-G991U |
Image title | RemasterDirector_18da6b0cf |
Date and time of data generation | 16:56, 17 April 2022 |
Exposure time | 11/10,000 sec (0.0011) |
F-number | f/1.8 |
User comments | e |
ISO speed rating | 40 |
Lens focal length | 5.4 mm |
Latitude | 43° 2′ 15.69″ N |
Altitude | 133 meters above sea level |
Longitude | 76° 8′ 12.06″ W |
Compression scheme | JPEG (old) |
Height | 3,024 px |
Orientation | Normal |
File change date and time | 16:56, 17 April 2022 |
Vertical resolution | 72 dpi |
Horizontal resolution | 72 dpi |
Width | 4,032 px |
Software used | G991USQU5CVCC |
Y and C positioning | Centered |
APEX aperture | 1.69 |
Exif version | 2.2 |
APEX exposure bias | 0 |
Exposure Program | Normal program |
Color space | sRGB |
Unique image ID | R12QSMF00SM |
Maximum land aperture | 1.69 APEX (f/1.8) |
APEX brightness | 7.61 |
White balance | Auto white balance |
Exposure mode | Auto exposure |
Flash | Flash did not fire |
Focal length in 35 mm film | 26 mm |
Digital zoom ratio | 1 |
Date and time of digitizing | 16:56, 17 April 2022 |
APEX shutter speed | 9.7 |
Metering mode | Spot |
Scene capture type | Standard |
Light source | Unknown |