File:Turbine Tower No 20 during construction - geograph.org.uk - 1033226.jpg
Turbine_Tower_No_20_during_construction_-_geograph.org.uk_-_1033226.jpg (640 × 480 pixels, file size: 34 KB, MIME type: image/jpeg)
Captions
Summary
[edit]DescriptionTurbine Tower No 20 during construction - geograph.org.uk - 1033226.jpg |
English: Turbine Tower No 20 during construction. Turbine No 20, seen here under construction, was completed on Wednesday the 28th of May 2008 after lengthy delays due bad weather and high winds.
Following a public inquiry held in 2004, planning consent was granted by the Secretary of State on the 25th May 2005 for the building of Scout Moor Wind Farm. Construction of the wind turbines began back in November 2007 at Turbine No 16. By June 2008 engineers had constructed 26 wind turbine towers and installed 78 turbine blades 450 metres above sea level on Scout Moor amid adverse weather conditions of thick fog,gale force winds,torrential rain,snow and ice during the winter months of 2008. On the 25th of September 2008 dignitaries from across the North West were invited to the official opening of the Scout Moor wind farm. Children from Edenfield Primary School , who have enjoyed lessons based around the wind farm, were on hand to cut the ribbon at Turbine No 22.https://www.geograph.org.uk/photo/980311 Head Teacher at Edenfield Primary School, Janet Reidy, said: "It was superb for the children to be involved after all the work they had done about the wind farm in their lessons. I think they will all remember this in future years and now they know what it's like to be film stars with all the camera crews there!" Richard Dibley, wind power development manager at Peel, said at the opening: "We have welcomed people here today to thank them for their patience and understanding during the construction period and for them to see the wind farm in action at close quarters. I think we have chosen the perfect site here as it is more than 50% windier up here than it is in the surrounding area. These turbines will be generating power for years to come using a natural resource that will never run out." 812973 812889 696963 633643 824546 989899 Turbine details: Tower Height: 60m Blade Length: 40m Total Max Height: 100m Manufacturer: Nordex Model: N80 http://www.nordex-online.com/en/products-services/wind-turbines/n80-25-mw.html Key Facts http://www.scoutmoorwindfarm.co.uk/keyfacts.html Scout Moor Wind Farm Construction Picture Gallery https://www.geograph.org.uk/gallery/scoutmoor_wind_farm_construction_6568 |
Date | |
Source | From geograph.org.uk |
Author | Paul Anderson |
Attribution (required by the license) InfoField | Paul Anderson / Turbine Tower No 20 during construction / |
InfoField | Paul Anderson / Turbine Tower No 20 during construction |
Camera location | 53° 39′ 46″ N, 2° 15′ 06″ W | View this and other nearby images on: OpenStreetMap | 53.662770; -2.251600 |
---|
Object location | 53° 39′ 49″ N, 2° 15′ 28″ W | View this and other nearby images on: OpenStreetMap | 53.663650; -2.257800 |
---|
Licensing
[edit]This image was taken from the Geograph project collection. See this photograph's page on the Geograph website for the photographer's contact details. The copyright on this image is owned by Paul Anderson and is licensed for reuse under the Creative Commons Attribution-ShareAlike 2.0 license.
|
- You are free:
- to share – to copy, distribute and transmit the work
- to remix – to adapt the work
- Under the following conditions:
- attribution – You must give appropriate credit, provide a link to the license, and indicate if changes were made. You may do so in any reasonable manner, but not in any way that suggests the licensor endorses you or your use.
- share alike – If you remix, transform, or build upon the material, you must distribute your contributions under the same or compatible license as the original.
File history
Click on a date/time to view the file as it appeared at that time.
Date/Time | Thumbnail | Dimensions | User | Comment | |
---|---|---|---|---|---|
current | 19:28, 23 February 2011 | 640 × 480 (34 KB) | GeographBot (talk | contribs) | == {{int:filedesc}} == {{Information |description={{en|1=Turbine Tower No 20 during construction Turbine No 20, seen here under construction, was completed on Wednesday the 28th of May 2008 after lengthy delays due bad weather and high winds. Following |
You cannot overwrite this file.
File usage on Commons
There are no pages that use this file.
Metadata
This file contains additional information such as Exif metadata which may have been added by the digital camera, scanner, or software program used to create or digitize it. If the file has been modified from its original state, some details such as the timestamp may not fully reflect those of the original file. The timestamp is only as accurate as the clock in the camera, and it may be completely wrong.
_error | 0 |
---|
Structured data
Items portrayed in this file
depicts
some value
53°39'45.97"N, 2°15'5.76"W
26 May 2008
53°39'49.14"N, 2°15'28.08"W
- Information field template with formatting
- Files with coordinates missing SDC location of creation (53° N, 3° W)
- CC-BY-SA-2.0
- Images from Geograph Britain and Ireland
- Images from Geograph Britain and Ireland missing SDC depicts
- Images from Geograph Britain and Ireland missing SDC location of creation
- Images from Geograph Britain and Ireland missing SDC MIME type
- United Kingdom photographs taken on 2008-05-26
- Images by Paul Anderson