File:Summit Construction Progress March 2019 (rubin-dome-3152019).jpg
From Wikimedia Commons, the free media repository
Jump to navigation
Jump to search
Size of this preview: 800 × 413 pixels. Other resolutions: 320 × 165 pixels | 640 × 330 pixels | 1,361 × 702 pixels.
Original file (1,361 × 702 pixels, file size: 187 KB, MIME type: image/jpeg)
File information
Structured data
Captions
Summary
[edit]DescriptionSummit Construction Progress March 2019 (rubin-dome-3152019).jpg |
English: The summit has been buzzing with activity this month; highlights include the ongoing assembly and verification of the Coating Plant, Secondary Mirror (M2) cell assembly unpacking and integration with the M2 cart, and progress on the Dome, including installation of the side wall purlins and upper dome platform. |
Date | 21 March 2019 (upload date) |
Source | Summit Construction Progress March 2019 |
Author | Rubin Observatory/NSF/AURA |
Other versions |
|
Licensing
[edit]This media was created by the National Optical-Infrared Astronomy Research Laboratory (NOIRLab).
Their website states: "Unless specifically noted, the images, videos, and music distributed on the public NOIRLab website, along with the texts of press releases, announcements, images of the week and captions; are licensed under a Creative Commons Attribution 4.0 International License, and may on a non-exclusive basis be reproduced without fee provided the credit is clear and visible." To the uploader: You must provide a link (URL) to the original file and the authorship information if available. | |
This file is licensed under the Creative Commons Attribution 4.0 International license.
|
File history
Click on a date/time to view the file as it appeared at that time.
Date/Time | Thumbnail | Dimensions | User | Comment | |
---|---|---|---|---|---|
current | 18:28, 20 October 2023 | 1,361 × 702 (187 KB) | OptimusPrimeBot (talk | contribs) | #Spacemedia - Upload of https://noirlab.edu/public/media/archives/images/large/rubin-dome-3152019.jpg via Commons:Spacemedia |
You cannot overwrite this file.
File usage on Commons
The following page uses this file:
Metadata
This file contains additional information such as Exif metadata which may have been added by the digital camera, scanner, or software program used to create or digitize it. If the file has been modified from its original state, some details such as the timestamp may not fully reflect those of the original file. The timestamp is only as accurate as the clock in the camera, and it may be completely wrong.
Image title |
|
---|---|
Credit/Provider | LSST Project/NSF/AURA |
Date and time of data generation | 15 March 2019 |
JPEG file comment | The summit has been buzzing with activity this month; highlights include the ongoing assembly and verification of the Coating Plant, Secondary Mirror (M2) cell assembly unpacking and integration with the M2 cart, and progress on the Dome, including installation of the side wall purlins and upper dome platform. |
Software used | Webdam http://www.webdam.com |
Date and time of digitizing | 16:40, 5 December 2019 |
File change date and time | 03:57, 10 April 2020 |
Date metadata was last modified | 03:57, 10 April 2020 |
Unique ID of original document | 55D59E67B518EEF694B104903F85E7B4 |
Sublocation of city shown | Cerro Pachón, Chile |