File:Summit Construction Progress March 2019 (rubin-20190305-151556).jpg
From Wikimedia Commons, the free media repository
Jump to navigation
Jump to search
Size of this preview: 800 × 389 pixels. Other resolutions: 320 × 156 pixels | 640 × 311 pixels | 1,024 × 498 pixels | 1,280 × 622 pixels | 4,032 × 1,960 pixels.
Original file (4,032 × 1,960 pixels, file size: 2.25 MB, MIME type: image/jpeg)
File information
Structured data
Captions
Summary
[edit]DescriptionSummit Construction Progress March 2019 (rubin-20190305-151556).jpg |
English: The summit has been buzzing with activity this month; highlights include the ongoing assembly and verification of the Coating Plant, Secondary Mirror (M2) cell assembly unpacking and integration with the M2 cart, and progress on the Dome, including installation of the side wall purlins and upper dome platform. |
Date | 15 March 2019 (upload date) |
Source | Summit Construction Progress March 2019 |
Author | Rubin Observatory/NSF/AURA |
Other versions |
|
Licensing
[edit]This media was created by the National Optical-Infrared Astronomy Research Laboratory (NOIRLab).
Their website states: "Unless specifically noted, the images, videos, and music distributed on the public NOIRLab website, along with the texts of press releases, announcements, images of the week and captions; are licensed under a Creative Commons Attribution 4.0 International License, and may on a non-exclusive basis be reproduced without fee provided the credit is clear and visible." To the uploader: You must provide a link (URL) to the original file and the authorship information if available. | |
This file is licensed under the Creative Commons Attribution 4.0 International license.
|
File history
Click on a date/time to view the file as it appeared at that time.
Date/Time | Thumbnail | Dimensions | User | Comment | |
---|---|---|---|---|---|
current | 18:34, 20 October 2023 | 4,032 × 1,960 (2.25 MB) | OptimusPrimeBot (talk | contribs) | #Spacemedia - Upload of https://noirlab.edu/public/media/archives/images/large/rubin-20190305-151556.jpg via Commons:Spacemedia |
You cannot overwrite this file.
File usage on Commons
The following page uses this file:
Metadata
This file contains additional information such as Exif metadata which may have been added by the digital camera, scanner, or software program used to create or digitize it. If the file has been modified from its original state, some details such as the timestamp may not fully reflect those of the original file. The timestamp is only as accurate as the clock in the camera, and it may be completely wrong.
Image title |
|
---|---|
Credit/Provider | LSST Project/NSF/AURA |
Date and time of data generation | 15 March 2019 |
JPEG file comment | The summit has been buzzing with activity this month; highlights include the ongoing assembly and verification of the Coating Plant, Secondary Mirror (M2) cell assembly unpacking and integration with the M2 cart, and progress on the Dome, including installation of the side wall purlins and upper dome platform. |
Lens used | Samsung Galaxy S8+ Rear Camera |
Software used | Webdam http://www.webdam.com |
File change date and time | 16:16, 18 December 2019 |
Date and time of digitizing | 15:15, 5 March 2019 |
Date metadata was last modified | 16:16, 18 December 2019 |
Unique ID of original document | 607078EB2908CFA4526CCF02DD4A02F7 |
Sublocation of city shown | Cerro Pachón, Chile |