File:Scout Moor Wind Farm East - geograph.org.uk - 860709.jpg

From Wikimedia Commons, the free media repository
Jump to navigation Jump to search

Scout_Moor_Wind_Farm_East_-_geograph.org.uk_-_860709.jpg (640 × 359 pixels, file size: 50 KB, MIME type: image/jpeg)

Captions

Captions

Add a one-line explanation of what this file represents

Summary

[edit]
Description
English: Scout Moor Wind Farm East. Completed in the Spring of 2008 this is the Eastern end of the Scout Moor Wind Farm above Rochdale.

In the foreground is Turbine No 19 which one of the first towers to be built in this section. 696996 622953 854085 696211 696963 824546

Turbine details: Tower Height: 60m Blade Length: 40m Total Max Height: 100m Manufacturer: Nordex Model: N80 http://www.nordex-online.com/en/products-services/wind-turbines/n80-25-mw.html

Key Facts http://www.scoutmoorwindfarm.co.uk/keyfacts.html

Scout Moor Wind Farm Construction Picture Gallery

https://www.geograph.org.uk/gallery/scoutmoor_wind_farm_construction_6568
Date
Source From geograph.org.uk
Author Paul Anderson
Attribution
(required by the license)
InfoField
Paul Anderson / Scout Moor Wind Farm East / 
Paul Anderson / Scout Moor Wind Farm East
Camera location53° 39′ 55″ N, 2° 14′ 00″ W  Heading=180° Kartographer map based on OpenStreetMap.View this and other nearby images on: OpenStreetMapinfo
Object location53° 39′ 43″ N, 2° 13′ 58″ W  Heading=180° Kartographer map based on OpenStreetMap.View this and other nearby images on: OpenStreetMapinfo

Licensing

[edit]
w:en:Creative Commons
attribution share alike
This file is licensed under the Creative Commons Attribution-Share Alike 2.0 Generic license.
Attribution: Paul Anderson
You are free:
  • to share – to copy, distribute and transmit the work
  • to remix – to adapt the work
Under the following conditions:
  • attribution – You must give appropriate credit, provide a link to the license, and indicate if changes were made. You may do so in any reasonable manner, but not in any way that suggests the licensor endorses you or your use.
  • share alike – If you remix, transform, or build upon the material, you must distribute your contributions under the same or compatible license as the original.

File history

Click on a date/time to view the file as it appeared at that time.

Date/TimeThumbnailDimensionsUserComment
current06:36, 21 February 2011Thumbnail for version as of 06:36, 21 February 2011640 × 359 (50 KB)GeographBot (talk | contribs)== {{int:filedesc}} == {{Information |description={{en|1=Scout Moor Wind Farm East Completed in the Spring of 2008 this is the Eastern end of the Scout Moor Wind Farm above Rochdale. In the foreground is Turbine No 19 which one of the first towers to be

There are no pages that use this file.

Metadata