File:Lloyds Stabilisation 2008 - geograph.org.uk - 873705.jpg
From Wikimedia Commons, the free media repository
Jump to navigation
Jump to search
Lloyds_Stabilisation_2008_-_geograph.org.uk_-_873705.jpg (640 × 480 pixels, file size: 114 KB, MIME type: image/jpeg)
File information
Structured data
Captions
Summary
[edit]DescriptionLloyds Stabilisation 2008 - geograph.org.uk - 873705.jpg |
English: Lloyds Stabilisation 2008 Lloyds Stabilisation project, due for completion Autumn 2008. 370 tubular steel piles 10 - 20 metres long are being driven into the bank on both sides of the river Severn, to curb the natural tendency of the sides of the Severn Gorge to slid into the water. The works are duplicated on both sides of the river, with 90-ton cranes and 100-ton pile-drivers. Sabrina looks rather subdued--at the moment... |
Date | |
Source | From geograph.org.uk |
Author | Mike White |
Attribution (required by the license) InfoField | Mike White / Lloyds Stabilisation 2008 / |
InfoField | Mike White / Lloyds Stabilisation 2008 |
Camera location | 52° 37′ 33″ N, 2° 28′ 07″ W | View this and other nearby images on: OpenStreetMap | 52.625950; -2.468500 |
---|
Object location | 52° 37′ 32″ N, 2° 28′ 07″ W | View this and other nearby images on: OpenStreetMap | 52.625500; -2.468600 |
---|
Licensing
[edit]This image was taken from the Geograph project collection. See this photograph's page on the Geograph website for the photographer's contact details. The copyright on this image is owned by Mike White and is licensed for reuse under the Creative Commons Attribution-ShareAlike 2.0 license.
|
This file is licensed under the Creative Commons Attribution-Share Alike 2.0 Generic license.
Attribution: Mike White
- You are free:
- to share – to copy, distribute and transmit the work
- to remix – to adapt the work
- Under the following conditions:
- attribution – You must give appropriate credit, provide a link to the license, and indicate if changes were made. You may do so in any reasonable manner, but not in any way that suggests the licensor endorses you or your use.
- share alike – If you remix, transform, or build upon the material, you must distribute your contributions under the same or compatible license as the original.
File history
Click on a date/time to view the file as it appeared at that time.
Date/Time | Thumbnail | Dimensions | User | Comment | |
---|---|---|---|---|---|
current | 09:21, 21 February 2011 | 640 × 480 (114 KB) | GeographBot (talk | contribs) | == {{int:filedesc}} == {{Information |description={{en|1=Lloyds Stabilisation 2008 Lloyds Stabilisation project, due for completion Autumn 2008. 370 tubular steel piles 10 - 20 metres long are being driven into the bank on both sides of the river Severn, |
You cannot overwrite this file.
File usage on Commons
There are no pages that use this file.
Metadata
This file contains additional information such as Exif metadata which may have been added by the digital camera, scanner, or software program used to create or digitize it. If the file has been modified from its original state, some details such as the timestamp may not fully reflect those of the original file. The timestamp is only as accurate as the clock in the camera, and it may be completely wrong.
_error | 0 |
---|