File:Flume under construction, top view, May 6, 1911 (SPWS 411).jpg

From Wikimedia Commons, the free media repository
Jump to navigation Jump to search

Original file (768 × 602 pixels, file size: 61 KB, MIME type: image/jpeg)

Captions

Captions

Add a one-line explanation of what this file represents

Summary

[edit]
English: Flume under construction, top view, May 6, 1911   (Wikidata search (Cirrus search) Wikidata query (SPARQL)  Create new Wikidata item based on this file)
Photographer
Unknown authorUnknown author
Title
English: Flume under construction, top view, May 6, 1911
Description
English: Construction photographs of the White River Power Plant, a hydroelectric facility on the White River, built by the Pacific Coast Power Company, 1909-1911. This company was acquired by Puget Sound Traction, Light & Power Company in 1912.

Caption on image: Flume at camp #8 looking N.W., J.O. 397, No. 378, 5-6-11.

PH Coll 269.757

  • Subjects (LCTGM): Excavation--Washington (State)
  • Subjects (LCSH): Flumes--Design and construction
Depicted place
English: United States--Washington (State)--White River Watershed
Date Taken on 6 May 1911
Medium
English: silver gelatin, b&w : 8 x 10 in.
institution QS:P195,Q219563
Current location
Accession number
Source
Permission
(Reusing this file)
Public domain
This work is in the public domain in the United States because it was published (or registered with the U.S. Copyright Office) before January 1, 1929.
Order Number
InfoField
WWDL0140

File history

Click on a date/time to view the file as it appeared at that time.

Date/TimeThumbnailDimensionsUserComment
current01:39, 17 July 2021Thumbnail for version as of 01:39, 17 July 2021768 × 602 (61 KB)BMacZeroBot (talk | contribs)Automatic lossless crop (watermark)
01:39, 17 July 2021Thumbnail for version as of 01:39, 17 July 2021768 × 632 (64 KB)BMacZeroBot (talk | contribs)Batch upload (Commons:Batch uploading/University of Washington Digital Collections)