File:Bundesarchiv Bild 183-63178-0003, Werftarbeiter sichern Planerfüllung zum 1. Mai (cropped).jpg
From Wikimedia Commons, the free media repository
Jump to navigation
Jump to search
Size of this preview: 453 × 599 pixels. Other resolutions: 181 × 240 pixels | 597 × 790 pixels.
Original file (597 × 790 pixels, file size: 55 KB, MIME type: image/jpeg)
File information
Structured data
Captions
Summary
[edit]Werftarbeiter sichern Planerfüllung zum 1. Mai ( ) | |||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Photographer |
Mellahn |
||||||||||||||||||||||||||
Title |
Werftarbeiter sichern Planerfüllung zum 1. Mai |
||||||||||||||||||||||||||
Original caption |
For documentary purposes the German Federal Archive often retained the original image captions, which may be erroneous, biased, obsolete or politically extreme. Zentralbild-Mellahn Froe-Ho. 3.4.1959 Werftarbeiter sichern Planerfüllung zum 1. Mai. Die Werktätigen der Wanremünder Warnowwerft haben sich vorgenommen, trotz der anfangs eingetretenen Planrückstände bis zum 1. Mai den Frachter "Erfurt" - den neunten 10 000-Tonner - an die Deutsche Seereederei und den fünften Kohle-Erz-Frachter "Usolje" an den sowjetischen Auftraggeber auszuliefern. Dazu hAben zahlreiche Brigaden Einzel- und Kollektivverpflichtungen übernommen, deren Erfüllung von 16 Ingenieuren des Betriebsbereiches Ausbau unterstützt wird. UBz: Der 7 000-Tonnen-Kohle-Erz-Frachter "Usolje" am Ausrüstungskai der Werft." |
||||||||||||||||||||||||||
Date |
3 April 1959 date QS:P571,+1959-04-03T00:00:00Z/11 |
||||||||||||||||||||||||||
Collection |
institution QS:P195,Q685753 |
||||||||||||||||||||||||||
Current location |
Allgemeiner Deutscher Nachrichtendienst - Zentralbild (Bild 183) |
||||||||||||||||||||||||||
Accession number | |||||||||||||||||||||||||||
Source |
|
||||||||||||||||||||||||||
Other versions |
|
Licensing
[edit]This file is licensed under the Creative Commons Attribution-Share Alike 3.0 Germany license.
Attribution: Bundesarchiv, Bild 183-63178-0003 / Mellahn / CC-BY-SA 3.0
- You are free:
- to share – to copy, distribute and transmit the work
- to remix – to adapt the work
- Under the following conditions:
- attribution – You must give appropriate credit, provide a link to the license, and indicate if changes were made. You may do so in any reasonable manner, but not in any way that suggests the licensor endorses you or your use.
- share alike – If you remix, transform, or build upon the material, you must distribute your contributions under the same or compatible license as the original.
File history
Click on a date/time to view the file as it appeared at that time.
Date/Time | Thumbnail | Dimensions | User | Comment | |
---|---|---|---|---|---|
current | 02:11, 24 February 2024 | 597 × 790 (55 KB) | Broichmore (talk | contribs) | File:Bundesarchiv Bild 183-63178-0003, Werftarbeiter sichern Planerfüllung zum 1. Mai.jpg cropped 5 % horizontally, 1 % vertically using CropTool with precise mode. Removed border. Removed watermark. |
You cannot overwrite this file.
File usage on Commons
The following 2 pages use this file:
Metadata
This file contains additional information such as Exif metadata which may have been added by the digital camera, scanner, or software program used to create or digitize it. If the file has been modified from its original state, some details such as the timestamp may not fully reflect those of the original file. The timestamp is only as accurate as the clock in the camera, and it may be completely wrong.
Image title | Zentralbild-Mellahn Froe-Ho. 3.4.1959 Werftarbeiter sichern Planerfüllung zum 1. Mai. Die Werktätigen der Wanremünder Warnowwerft haben sich vorgenommen, trotz der anfangs eingetretenen Planrückstände bis zum 1. Mai den Frachter "Erfurt" - den neunten 10 000-Tonner - an die Deutsche Seereederei und den fünften Kohle-Erz-Frachter "Usolje" an den sowjetischen Auftraggeber auszuliefern. Dazu hAben zahlreiche Brigaden Einzel- und Kollektivverpflichtungen übernommen, deren Erfüllung von 16 Ingenieuren des Betriebsbereiches Ausbau unterstützt wird. UBz: Der 7 000-Tonnen-Kohle-Erz-Frachter "Usolje" am Ausrüstungskai der Werft." |
---|---|
Headline | Werftarbeiter sichern Planerfüllung zum 1. Mai |
Author | Mellahn |
Credit/Provider | Bundesarchiv |
Short title | Bild 183-63178-0003 |
Date and time of data generation | 3 April 1959 |
IIM version | 2 |