File:Bundesarchiv Bild 183-45570-0011, Briesko, BKW "Franz Mehring", Schichtwechsel.jpg
From Wikimedia Commons, the free media repository
Jump to navigation
Jump to search
Size of this preview: 453 × 600 pixels. Other resolutions: 181 × 240 pixels | 604 × 800 pixels.
Original file (604 × 800 pixels, file size: 89 KB, MIME type: image/jpeg)
File information
Structured data
Captions
Summary
[edit]Photographer |
creator QS:P170,Q110961887 |
||||||||||||||||||||||||||
Original caption |
For documentary purposes the German Federal Archive often retained the original image captions, which may be erroneous, biased, obsolete or politically extreme. Briesko, BKW "Franz Mehring", Schichtwechsel
Zentralbild Junge 27.3.1957 Generalreparatur an der Abraumförderbrücke des BKW "Franz Mehring" Da die Schwenkrichtung im Tagebau des BKW "Franz Mehring" in Briesko-Ost geändert wird, muß die Abraumförderbrücke umgestellt werden. Dabei wird gleichzeitig eine Generalreparatur an der Brücke durchgeführt. Im Volkswirtschaftsplan sind für diese Arbeiten 45 Tage vorgesehen. Im Kampfplan des BKW "Franz Mehring" stellten sich die Arbeiter und Kumpel jedoch eine Frist von 36 Tagen, um die Brücke wieder einsatzfähig zu machen. Dabei werden sie von den Kollegen des BFG Lauchhammer, des volkseigenen Elektromontagebaus Cottbus sowie 55 Hilfskräften aus der Neptun-Werft Rostock und Stoßbrigaden der FDJ aus den umliegenden Industrien unterstützt. Die hauptsächlichsten Arbeiten, die an der Abraumförderbrücke durchgeführt werden, sind das Auswechseln der Transportbänder, Reparaturen an Eimerkette und Eimerleiter sowie das Durchsehen und Überholen der elektrischen Anlagen. UBz: Schichtwechsel am Schaufelradbagger. |
||||||||||||||||||||||||||
Depicted place | Brieske | ||||||||||||||||||||||||||
Date |
27 March 1957 date QS:P571,+1957-03-27T00:00:00Z/11 |
||||||||||||||||||||||||||
Collection |
institution QS:P195,Q685753 |
||||||||||||||||||||||||||
Current location |
Allgemeiner Deutscher Nachrichtendienst - Zentralbild (Bild 183) |
||||||||||||||||||||||||||
Accession number | |||||||||||||||||||||||||||
Source |
|
Licensing
[edit]This file is licensed under the Creative Commons Attribution-Share Alike 3.0 Germany license.
Attribution: Bundesarchiv, Bild 183-45570-0011 / CC-BY-SA 3.0
- You are free:
- to share – to copy, distribute and transmit the work
- to remix – to adapt the work
- Under the following conditions:
- attribution – You must give appropriate credit, provide a link to the license, and indicate if changes were made. You may do so in any reasonable manner, but not in any way that suggests the licensor endorses you or your use.
- share alike – If you remix, transform, or build upon the material, you must distribute your contributions under the same or compatible license as the original.
File history
Click on a date/time to view the file as it appeared at that time.
Date/Time | Thumbnail | Dimensions | User | Comment | |
---|---|---|---|---|---|
current | 11:20, 4 December 2008 | 604 × 800 (89 KB) | BArchBot (talk | contribs) | == Summary == {{Information |Description={{de|1='''Briesko, BKW "Franz Mehring", Schichtwechsel''' Zentralbild Junge 27.3.1957 Generalreparatur an der Abraumförderbrücke des BKW "Franz Mehring" Da die Schwenkrichtung im Tagebau des BKW "Franz Mehring" |
You cannot overwrite this file.
File usage on Commons
The following page uses this file:
Metadata
This file contains additional information such as Exif metadata which may have been added by the digital camera, scanner, or software program used to create or digitize it. If the file has been modified from its original state, some details such as the timestamp may not fully reflect those of the original file. The timestamp is only as accurate as the clock in the camera, and it may be completely wrong.
Image title | Zentralbild Junge 27.3.1957 Generalreparatur an der Abraumförderbrücke des BKW "Franz Mehring" Da die Schwenkrichtung im Tagebau des BKW "Franz Mehring" in Briesko-Ost geändert wird, muß die Abraumförderbrücke umgestellt werden. Dabei wird gleichzeitig eine Generalreparatur an der Brücke durchgeführt. Im Volkswirtschaftsplan sind für diese Arbeiten 45 Tage vorgesehen. Im Kampfplan des BKW "Franz Mehring" stellten sich die Arbeiter und Kumpel jedoch eine Frist von 36 Tagen, um die Brücke wieder einsatzfähig zu machen. Dabei werden sie von den Kollegen des BFG Lauchhammer, des volkseigenen Elektromontagebaus Cottbus sowie 55 Hilfskräften aus der Neptun-Werft Rostock und Stoßbrigaden der FDJ aus den umliegenden Industrien unterstützt. Die hauptsächlichsten Arbeiten, die an der Abraumförderbrücke durchgeführt werden, sind das Auswechseln der Transportbänder, Reparaturen an Eimerkette und Eimerleiter sowie das Durchsehen und Überholen der elektrischen Anlagen. UBz: Schichtwechsel am Schaufelradbagger. |
---|---|
Headline | Briesko, BKW "Franz Mehring", Schichtwechsel |
Author | Junge, Peter Heinz |
Credit/Provider | Bundesarchiv |
Short title | Bild 183-45570-0011 |
Date and time of data generation | 27 March 1957 |
IIM version | 2 |