File:Ahmedabad Metro Underconstruction 9 July 2017 NS Line 02.jpg

From Wikimedia Commons, the free media repository
Jump to navigation Jump to search

Original file (4,096 × 2,304 pixels, file size: 2.64 MB, MIME type: image/jpeg)

Captions

Captions

Add a one-line explanation of what this file represents

Summary

[edit]
Description
English: Ahmedabad Metro North South Line Underconstruction near Sabarmati Powerhouse and Sabarmati Railway Station 9 July 2017.
Date
Source Own work
Author Nizil Shah

Licensing

[edit]
I, the copyright holder of this work, hereby publish it under the following license:
w:en:Creative Commons
attribution share alike
This file is licensed under the Creative Commons Attribution-Share Alike 4.0 International license.
You are free:
  • to share – to copy, distribute and transmit the work
  • to remix – to adapt the work
Under the following conditions:
  • attribution – You must give appropriate credit, provide a link to the license, and indicate if changes were made. You may do so in any reasonable manner, but not in any way that suggests the licensor endorses you or your use.
  • share alike – If you remix, transform, or build upon the material, you must distribute your contributions under the same or compatible license as the original.

File history

Click on a date/time to view the file as it appeared at that time.

Date/TimeThumbnailDimensionsUserComment
current06:15, 11 July 2017Thumbnail for version as of 06:15, 11 July 20174,096 × 2,304 (2.64 MB)Nizil Shah (talk | contribs)User created page with UploadWizard

There are no pages that use this file.

File usage on other wikis

The following other wikis use this file:

Metadata