File:2019-12-16 Madlow, bus driveway exit (1 of 2).png
From Wikimedia Commons, the free media repository
Jump to navigation
Jump to search
Size of this preview: 800 × 530 pixels. Other resolutions: 320 × 212 pixels | 640 × 424 pixels | 1,024 × 678 pixels | 1,280 × 848 pixels | 3,000 × 1,987 pixels.
Original file (3,000 × 1,987 pixels, file size: 9.98 MB, MIME type: image/png)
File information
Structured data
Captions
Summary
[edit]Description2019-12-16 Madlow, bus driveway exit (1 of 2).png |
English: Last of the major construction work had been completed last week, which meant service at the new tram/bus interchange at Madlow could commence on 2019-12-16. Further work is required, such as installing the remaining glass panels of the bicycle shelters, but nothing which would interfere with regular operation. The intersection with Madlower Hauptstraße, while protected by an additional set of traffic lights, is a somewhat compromised layout constrained by the limited space available. |
Date | |
Source | Own work |
Author | Trio3D |
Camera location | 51° 43′ 16.68″ N, 14° 20′ 45.58″ E | View this and other nearby images on: OpenStreetMap | 51.721300; 14.345994 |
---|
This file is licensed under the Creative Commons Attribution-Share Alike 4.0 International license.
- You are free:
- to share – to copy, distribute and transmit the work
- to remix – to adapt the work
- Under the following conditions:
- attribution – You must give appropriate credit, provide a link to the license, and indicate if changes were made. You may do so in any reasonable manner, but not in any way that suggests the licensor endorses you or your use.
- share alike – If you remix, transform, or build upon the material, you must distribute your contributions under the same or compatible license as the original.
File history
Click on a date/time to view the file as it appeared at that time.
Date/Time | Thumbnail | Dimensions | User | Comment | |
---|---|---|---|---|---|
current | 09:13, 17 December 2019 | 3,000 × 1,987 (9.98 MB) | Trio3D (talk | contribs) | {{Information |description ={{en|1=Last of the major construction work had been completed last week, which meant service at the new tram/bus interchange at Madlow could commence on 2019-12-16. Further work is required, such as installing the remaining glass panels of the bicycle shelters, but nothing which would interfere with regular operation.<br><br>The intersection with Madlower Hauptstraße, while protected by an additional set of traffic lights, is a somewhat compromised layout constra... |
You cannot overwrite this file.
File usage on Commons
The following 4 pages use this file:
File usage on other wikis
The following other wikis use this file:
- Usage on de.wikipedia.org