File:The Final Turbine Blade - geograph.org.uk - 1021402.jpg

From Wikimedia Commons, the free media repository
Jump to navigation Jump to search

The_Final_Turbine_Blade_-_geograph.org.uk_-_1021402.jpg (640 × 480 pixels, file size: 48 KB, MIME type: image/jpeg)

Captions

Captions

Add a one-line explanation of what this file represents

Summary

[edit]
Description
English: The Final Turbine Blade. The final blade is prepared for lifting at Turbine No 23 as construction of the Scout Moor Wind Farm comes to an end.

Construction of the wind turbines began back in November 2007 at Turbine No 16. By June 2008 engineers had constructed 26 wind turbine towers and installed 78 turbine blades 450 metres above sea level on Scout Moor amid adverse weather conditions of thick fog, gale force winds, torrential rain, snow and ice during the winter months of 2008.

837229 837208 837169 833206 824546 687214

Turbine details: Tower Height: 60m Blade Length: 40m Total Max Height: 100m Manufacturer: Nordex

Model: N80
Date
Source From geograph.org.uk
Author Paul Anderson
Attribution
(required by the license)
InfoField
Paul Anderson / The Final Turbine Blade / 
Paul Anderson / The Final Turbine Blade
Camera location53° 39′ 58″ N, 2° 15′ 39″ W  Heading=202° Kartographer map based on OpenStreetMap.View this and other nearby images on: OpenStreetMapinfo
Object location53° 39′ 58″ N, 2° 15′ 39″ W  Heading=202° Kartographer map based on OpenStreetMap.View this and other nearby images on: OpenStreetMapinfo

Licensing

[edit]
w:en:Creative Commons
attribution share alike
This file is licensed under the Creative Commons Attribution-Share Alike 2.0 Generic license.
Attribution: Paul Anderson
You are free:
  • to share – to copy, distribute and transmit the work
  • to remix – to adapt the work
Under the following conditions:
  • attribution – You must give appropriate credit, provide a link to the license, and indicate if changes were made. You may do so in any reasonable manner, but not in any way that suggests the licensor endorses you or your use.
  • share alike – If you remix, transform, or build upon the material, you must distribute your contributions under the same or compatible license as the original.

File history

Click on a date/time to view the file as it appeared at that time.

Date/TimeThumbnailDimensionsUserComment
current15:44, 23 February 2011Thumbnail for version as of 15:44, 23 February 2011640 × 480 (48 KB)GeographBot (talk | contribs)== {{int:filedesc}} == {{Information |description={{en|1=The Final Turbine Blade The final blade is prepared for lifting at Turbine No 23 as construction of the Scout Moor Wind Farm comes to an end. Construction of the wind turbines began back in Novembe

There are no pages that use this file.

Metadata