File:Murray Elementary School Construction, Fort Stewart, GA (13880066004).jpg
Original file (5,286 × 2,034 pixels, file size: 4.81 MB, MIME type: image/jpeg)
Captions
Summary
[edit]DescriptionMurray Elementary School Construction, Fort Stewart, GA (13880066004).jpg | FORT STEWART, Ga. – Construction is nearing completion on a $20.5 million environmentally-friendly elementary school at Fort Stewart, shown here April 4, 2014. Built by the U.S. Army Corps of Engineers Savannah District and prime contractor Sauer, Inc., the new Murray Elementary School is equipped with over 450 solar panels, a wind turbine, and other sustainable design features. The project was designed by architect-engineer firm VOA Associates, Inc., to satisfy Silver-level criteria on the Leadership in Energy and Environmental Design (LEED) rating system. At 83,000 square feet, it will accommodate up to 450 students (grades K-6) and 70 teachers and support staff. The school includes classrooms, computer labs, a gymnasium, a multipurpose "cafetorium" with a stage and a kitchen, a library, and administrative offices. USACE photo by George Jumara. |
Date | Taken on 4 April 2014, 10:01 |
Source | Murray Elementary School Construction, Fort Stewart, GA |
Author | U.S. Army Corps of Engineers Savannah District |
Licensing
[edit]This image was originally posted to Flickr by U.S. Army Corps of Engineers Savannah District at https://flickr.com/photos/45417428@N05/13880066004 (archive). It was reviewed on 8 September 2018 by FlickreviewR 2 and was confirmed to be licensed under the terms of the cc-by-2.0. |
8 September 2018
Public domainPublic domainfalsefalse |
This file is a work of a U.S. Army soldier or employee, taken or made as part of that person's official duties. As a work of the U.S. federal government, it is in the public domain in the United States.
العربية ∙ বাংলা ∙ català ∙ čeština ∙ Deutsch ∙ English ∙ español ∙ eesti ∙ فارسی ∙ suomi ∙ français ∙ hrvatski ∙ magyar ∙ Bahasa Indonesia ∙ italiano ∙ 日本語 ∙ 한국어 ∙ lietuvių ∙ македонски ∙ മലയാളം ∙ မြန်မာဘာသာ ∙ Nederlands ∙ polski ∙ português ∙ русский ∙ sicilianu ∙ српски / srpski ∙ Türkçe ∙ українська ∙ Tiếng Việt ∙ 中文(简体) ∙ 中文(繁體) ∙ +/− |
File history
Click on a date/time to view the file as it appeared at that time.
Date/Time | Thumbnail | Dimensions | User | Comment | |
---|---|---|---|---|---|
current | 01:19, 8 September 2018 | 5,286 × 2,034 (4.81 MB) | Tyler ser Noche (talk | contribs) | Transferred from Flickr via #flickr2commons |
You cannot overwrite this file.
File usage on Commons
There are no pages that use this file.
Metadata
This file contains additional information such as Exif metadata which may have been added by the digital camera, scanner, or software program used to create or digitize it. If the file has been modified from its original state, some details such as the timestamp may not fully reflect those of the original file. The timestamp is only as accurate as the clock in the camera, and it may be completely wrong.
Image title |
|
---|---|
Camera manufacturer | Canon |
Camera model | Canon EOS 5D Mark II |
Author | USACE |
Exposure time | 1/160 sec (0.00625) |
F-number | f/13 |
ISO speed rating | 100 |
Date and time of data generation | 10:01, 4 April 2014 |
Lens focal length | 24 mm |
Headline | construction of the new elementary school on Fort Stewart |
Width | 5,616 px |
Height | 3,744 px |
Bits per component |
|
Pixel composition | RGB |
Orientation | Normal |
Number of components | 3 |
Horizontal resolution | 300 dpi |
Vertical resolution | 300 dpi |
Software used | Adobe Photoshop CS5 Windows |
File change date and time | 14:20, 15 April 2014 |
Y and C positioning | Co-sited |
Exposure Program | Shutter priority |
Exif version | 2.21 |
Date and time of digitizing | 10:01, 4 April 2014 |
Meaning of each component |
|
APEX shutter speed | 7.375 |
APEX aperture | 7.375 |
APEX exposure bias | 0 |
Maximum land aperture | 4 APEX (f/4) |
Subject distance | 4.47 meters |
Metering mode | Pattern |
Flash | Flash did not fire, compulsory flash suppression |
DateTime subseconds | 65 |
DateTimeOriginal subseconds | 65 |
DateTimeDigitized subseconds | 65 |
Supported Flashpix version | 1 |
Color space | sRGB |
Focal plane X resolution | 3,849.2117888965 |
Focal plane Y resolution | 3,908.1419624217 |
Focal plane resolution unit | inches |
Custom image processing | Normal process |
Exposure mode | Auto exposure |
White balance | Auto white balance |
Scene capture type | Standard |
GPS tag version | 0.0.2.2 |
Serial number of camera | 652305674 |
Lens used | EF24-105mm f/4L IS USM |
Date metadata was last modified | 10:20, 15 April 2014 |
Unique ID of original document | FD20B98D9187221D0D89DD337C5BFD7E |
Keywords | construction of the new elementary school on Fort Stewart Corps Engineers Army |
Contact information |
|
IIM version | 2 |