File:High-flow Release - Glen Canyon Dam (2018) 9875 (52832742714).jpg

From Wikimedia Commons, the free media repository
Jump to navigation Jump to search

Original file (1,259 × 2,356 pixels, file size: 1.26 MB, MIME type: image/jpeg)

Captions

Captions

Add a one-line explanation of what this file represents

Summary

[edit]
Description

The goal of the High Flow Experiment (HFE) is to move sand stored in the river channel and redeposit it to rebuild eroded sandbars and beaches downstream of the Paria River in Grand Canyon National Park.

2023 High Flow Information from Bureau of Reclamation: <a href="https://www.usbr.gov/uc/progact/amp/ltemp.html" rel="noreferrer nofollow">www.usbr.gov/uc/progact/amp/ltemp.html</a>

2023 High Flow Information from Grand Canyon Nat. Park <a href="https://www.nps.gov/grca/learn/nature/hfe-23.htm" rel="noreferrer nofollow">www.nps.gov/grca/learn/nature/hfe-23.htm</a>

This photo is from the 2018 High Flow Release:

Side view looking down from the top of the dam on 4 jets of water being released from the river outlet tubes at the base of Glen Canyon Dam. The shadow from Glen Canyon Bridge, descends down, then curves around the surface of the dam. NPS/M.Quinn

Between November 5-10, 2018, the U.S. Department of Interior increased the release from Glen Canyon Dam for a high-flow experimental release (HFE) of approximately 38,100 cubic feet per second (cfs) for 3 days. (60 hours)

The goal of the high-flow experiment was to move sand stored in the river channel and redeposit it to rebuild eroded sandbars and beaches downstream of the Paria River in Grand Canyon National Park.

This release followed the science-based Protocol for High-Flow Experimental Releases from Glen Canyon Dam approved in the 2016 Long-Term Experimental and Management Plan Record of Decision for Glen Canyon Dam operations and is a component of the Department’s compliance with the Grand Canyon Protection Act of 1992.

The Grand Canyon Protection Act mandates that Glen Canyon Dam be operated in a manner that protects, mitigates adverse impacts to, and improves the values for which Grand Canyon National Park and Glen Canyon National Recreation Area were established.

Previous experimental releases from Glen Canyon Dam have demonstrated that it is possible to rebuild beaches and sandbars in Grand Canyon via high flows.

More information: <a href="http://www.nps.gov/grca/learn/nature/hfe-23.htm" rel="noreferrer nofollow">www.nps.gov/grca/learn/nature/hfe-23.htm</a>
Date
Source High-flow Release - Glen Canyon Dam (2018) 9875
Author Grand Canyon National Park

Licensing

[edit]
w:en:Creative Commons
attribution
This file is licensed under the Creative Commons Attribution 2.0 Generic license.
You are free:
  • to share – to copy, distribute and transmit the work
  • to remix – to adapt the work
Under the following conditions:
  • attribution – You must give appropriate credit, provide a link to the license, and indicate if changes were made. You may do so in any reasonable manner, but not in any way that suggests the licensor endorses you or your use.
This image was originally posted to Flickr by Grand Canyon NPS at https://flickr.com/photos/50693818@N08/52832742714. It was reviewed on 25 April 2023 by FlickreviewR 2 and was confirmed to be licensed under the terms of the cc-by-2.0.

25 April 2023

File history

Click on a date/time to view the file as it appeared at that time.

Date/TimeThumbnailDimensionsUserComment
current08:01, 25 April 2023Thumbnail for version as of 08:01, 25 April 20231,259 × 2,356 (1.26 MB)Hogo-2020 (talk | contribs)Cropped 74 % horizontally, 49 % vertically using CropTool with precise mode.
07:54, 25 April 2023Thumbnail for version as of 07:54, 25 April 20234,854 × 4,656 (6.64 MB)Hogo-2020 (talk | contribs)Transferred from Flickr via #flickr2commons

There are no pages that use this file.

Metadata