Category:Murray Baker Bridge during Upgrade 74
Jump to navigation
Jump to search
English: Murray Baker Bridge during the reconstruction of Interstate 74 in Peoria and East Peoria, Illinois. The construction lasted from April 2005 to October 2005.
Media in category "Murray Baker Bridge during Upgrade 74"
The following 5 files are in this category, out of 5 total.
-
I-74 Upgrade (Murray Baker Cut Short).jpg 800 × 533; 55 KB
-
I-74 Upgrade (road closed under Murray Baker).jpg 800 × 533; 58 KB
-
I-74 upgrade - Murray Baker Color Change.jpg 800 × 533; 32 KB
-
I-74 Upgrade Murray Baker - Caterpillar.jpg 800 × 533; 75 KB
-
I-74 upgrade Murray Baker Bridge.jpg 800 × 533; 130 KB